Project Journal – MS Center

MS Center rendering.This multiple lot project encompassed three phases. It is situated along a high traffic location at the corner of Monroe Street and Skelly Road.

The first phase was to develop site engineering for a new Aldi store. Placement of the building was crucial as it would set the precedent for the remaining open space and retail visibility.

The second phase, which is currently under construction, is to renovate an existing retail center and to provide an addition to that building. In doing so, the building will become the cornerstone to the lots. With its unique brick and lighted tower features, the building will not only accent the Aldi store, it will shine on its own.

The third phase will be to develop the rear open space. Plans for this space include office use and other options if required.

Thomas DuBose and Associates has provided and continues to provide site and building design, specifications, construction documents, material selections, and 3D renderings.

MS Center Project Gallery

Gallery Help

Use the left and right arrows at the top right of the gallery to scroll through the dates available. Select a specific date to view images within that gallery. Thumbnails will appear on the bottom of the gallery.

The gallery will always display the first image in a set in the main viewing area. Click on a thumbnail at the bottom of the gallery to view a larger image. For information on the construction and development process click on the first thumbnail within a set.

350 S. Reynolds Rd. Suite B, Toledo, OH 43615

XHTML 1.0 Transitional | CSS | Privacy Policy